Two-Year Limitation Period for VEFA: When the Seller Loses the Right to Payment of the Balance
Droit-immobilier

Two-Year Limitation Period for VEFA: When the Seller Loses the Right to Payment of the Balance

📅 Décision du 26 October 2017⚖️ Cour de cassation👁️ 9 vues📖 7 min de lecture

The Court of Cassation confirms that the professional seller's action in VEFA to obtain the balance of the price is time-barred after two years, in the absence of specific provisions. A decision that upsets practices and protects buyers.

Reference decision: cc • No. 16-13.591 • 2017-10-26 • View the decision →

Imagine: you bought a flat off-plan in Saint-Malo, delivered three years ago. The developer suddenly claims a balance of €15,000, which you thought was paid. Panic on board? Not necessarily. The Court of Cassation has ruled: for sales of property in a future state of completion (VEFA), the professional seller has only two years to bring an action for payment. After that time, it's over.

This decision of 26 October 2017 (No. 16-13.591) is a small legal bombshell. It applies to real estate professionals the two-year limitation period of the Consumer Code, which protects consumers against late actions. But then, what should you do if you are concerned? And how can you avoid finding yourself in this situation?

The issue is simple: thousands of euros can swing one way or the other depending on whether you are the seller or the buyer. Let's dive into the details with a concrete case.

The facts: a story that happens every day

Mr and Mrs Le Goff, a retired couple from Redon, signed a VEFA contract in 2010 for a detached house in a housing estate near Rennes. The total price was €250,000, payable in several drawdowns as work progressed. In 2012, the house was delivered, and the couple moved in. But the developer, Bâtir Ouest, claimed that a balance of €18,500 remained due, corresponding to additional works not provided for in the contract according to them.

For three years, there were exchanges of letters, formal notices, but nothing worked. The Le Goffs disputed the amount, arguing that the works were included. In 2015, the developer sued the couple before the Rennes High Court (Tribunal de grande instance de Rennes). The court dismissed the developer's claim, holding that his action was time-barred: he should have acted within two years of delivery, i.e., before the end of 2014. The Rennes Court of Appeal confirmed this in 2016.

The developer appealed to the Court of Cassation. He argued that VEFA is a property contract governed by the Construction and Housing Code (Code de la construction et de l'habitation), and that the ordinary limitation period (five years) should apply, not the reduced period of the Consumer Code. But the Court of Cassation dismissed the appeal: Article L. 137-2 (now L. 218-2) of the Consumer Code refers to "the action of professionals for the goods or services they provide to consumers." Now, a VEFA is indeed the supply of a property by a professional to a consumer. No special provision derogates from this two-year period. So, it's two years, full stop.

The reasoning of the court – dissected

The High Court relies on Article L. 218-2 of the Consumer Code (formerly L. 137-2), which provides: "The action of professionals, for the goods or services they provide to consumers, is time-barred after two years." This text is of general scope. It applies to all professionals, regardless of their sector, unless a special law provides for a different period.

For the Court, VEFA is a contract for the sale of a building to be constructed. The seller is a professional (developer, builder), the buyer is a consumer (individual). Nothing in the Construction and Housing Code sets a specific limitation period for the action for payment of the balance of the price. Admittedly, Article L. 261-1 of the Construction and Housing Code defines VEFA, but it says nothing about the time limit for claiming the price. Therefore, the general consumer law applies.

The developer argued that the action for payment of the price is not an action "for the goods or services provided," but an action for performance of the contract. The Court dismisses this argument: payment of the price is the direct consideration for the goods supplied. It is therefore indeed an action relating to the supply of the goods.

This decision is not a reversal. It confirms a protective trend for the consumer, already outlined in earlier decisions (e.g., Civ. 1re, 6 July 2016, No. 15-18.964, for a contract for the construction of an individual house). It simply extends this principle to VEFA.

What this changes for you – concretely

For you, as a buyer of a new home in Saint-Malo or elsewhere, this decision is a protection. If the developer claims a balance more than two years after delivery (or more than two years after the event giving rise to the debt, such as the due date for payment), you can raise the limitation period. Caution: the period runs from the date on which the seller became aware of his claim. In practice, this is often the delivery or the date of the last drawdown.

For the developer, it is a warning: he must act quickly. Do not delay in chasing, sending formal notices, or suing. After two years, the debt is extinguished. Example: a developer from Redon who forgets to claim a balance of €20,000 for 30 months loses all right to that sum. For an operation of 10 units, this could represent a loss of €200,000.

If you are a landlord who bought off-plan to rent out, you are also protected. Even if you are a professional (e.g., SCI), the status of consumer may be retained if you are not a real estate professional. But beware: if you are a property dealer, the two-year period does not apply, because you are not a consumer.

Four tips to avoid this type of dispute

  • Keep all documents for at least 5 years. Drawdown requests, delivery minutes, correspondence. In case of a dispute, you will be able to prove the date of the debt and the starting point of the limitation period.
  • For developers: send a formal notice as soon as the first default occurs. A formal notice interrupts the limitation period (Article 2244 of the Civil Code). It gives you a new two-year period to bring legal proceedings.
  • For buyers: check the date of the last claim. If the developer claims money more than two years after delivery, without having interrupted the limitation period, you can refuse to pay. Have this confirmed by a lawyer.
  • Negotiate a contractual limitation clause in the contract. Nothing prevents the parties from reducing the period (e.g., one year), but beware: too short a period may be unfair. It is better to stick to the law.

This decision is part of a protective line. Already in 2016, the Court of Cassation had applied the two-year limitation period to a contract for the construction of an individual house (Civ. 1re, 6 July 2016, No. 15-18.964). Here, it extends the principle to VEFA, which was expected but not yet decided.

Since 2017, the courts have systematically applied this period. For example, the Rennes Court of Appeal, in a judgment of 12 March 2019 (No. 17/08562), held that a developer's action for payment of late payment penalties was time-barred because it was brought more than two years after the due date. The trend is clear: the consumer is king, even in real estate.

In the future, we can expect the two-year limitation period to be extended to other actions by real estate professionals, such as claims for damages for non-conformity. Developers must therefore review their recovery procedures.

In practice: what to do

Checklist for the buyer receiving a late claim:

  1. Check the date of delivery (or the last drawdown request).
  2. Calculate the time elapsed. More than two years? The limitation period has expired.
  3. Consult a lawyer to confirm and draft a letter of reasoned refusal.
  4. Do not pay under any circumstances: a voluntary payment may be considered a waiver of the limitation period.

FAQ:

  • Does the two-year period run from the signing of the contract? No, generally from delivery or the due date of the balance.
  • Can I waive the limitation period? Yes, but it requires an express and unequivocal act. Mere silence is not enough.
  • What if the developer sues me after two years? Raise the limitation period in your pleadings. The judge must raise it of his own motion, but it is better to raise it yourself.
  • Does this decision apply to sales between individuals? No, because the seller is not a professional. The ordinary limitation period (5 years) applies.

Are you in a similar situation? A first 30-minute consultation with Maître Zakine (€45) can save you months of proceedings – and often much more. Book an appointment →

📌 Does this apply to your situation? Maître Cécile Zakine, French real estate lawyer, practises throughout France.
vefa-ccmi/" rel="dofollow">→ Avocat VEFA & construction  |  → Browse all our legal articles

Questions fréquentes

Quel est le délai de prescription pour le paiement du solde du prix en VEFA ?

Depuis l'arrêt du 26 octobre 2017, l'action du promoteur se prescrit par deux ans à compter de la livraison ou de l'exigibilité du solde, conformément à l'article L. 218-2 du Code de la consommation.

Puis-je refuser de payer un solde réclamé plus de deux ans après la livraison ?

Oui, vous pouvez opposer la prescription biennale. Ne payez pas sans consulter un avocat, car le paiement pourrait être interprété comme une renonciation à la prescription.

Que faire si le promoteur m'assigne en justice après deux ans ?

Invoquez la prescription dans vos conclusions. Le juge doit la relever d'office, mais il est prudent de la soulever vous-même avec l'aide d'un avocat spécialisé en droit immobilier.

Cette décision s'applique-t-elle aux ventes entre particuliers ?

Non, elle ne concerne que les ventes par un professionnel à un consommateur. Entre particuliers, la prescription de droit commun (5 ans) s'applique.

Comment interrompre la prescription biennale pour un promoteur ?

En envoyant une mise en demeure par lettre recommandée avec accusé de réception. Cela interrompt la prescription et fait courir un nouveau délai de deux ans. Une assignation en justice a le même effet.

Informations juridiques

  • Numéro: 16-13.591
  • Juridiction: Cour de cassation
  • Date de décision: 26 octobre 2017

Mots-clés

VEFAprescription biennalesolde du prixpromoteurCour de cassation

Cas d'usage pratiques

1

Buyer in Saint-Malo: balance claimed 3 years after delivery

A couple bought a new flat in Saint-Malo in 2020. Delivered in 2021, the developer claims a balance of €12,000 in 2024. The couple consults Maître Zakine.

Application pratique:

The two-year limitation period has expired (3 years after delivery). The couple can refuse to pay. They simply need to send a registered letter to the developer raising the limitation period. If the developer sues, the lawyer will raise the limitation period as a defence.

2

Developer in Redon: late recovery of €20,000

A developer in Redon delivered 5 VEFA houses in 2019. In 2022, he realises that a buyer has not paid the balance of €20,000. He initiates proceedings.

Application pratique:

The action is time-barred (over 2 years). The developer loses his debt. For the future, he must implement rigorous payment monitoring and send formal notices as soon as the first default occurs to interrupt the limitation period.

3

Investor landlord: limitation period raised by the developer

An investor bought a studio off-plan in Rennes to rent out. The developer claims €5,000 in additional costs 4 years after delivery. The investor disputes.

Application pratique:

The investor can raise the two-year limitation period, because he is a consumer even if he rents out the property. He must consult a lawyer to draft a formal response. The developer will not be able to obtain payment in court.

Maître Cécile Zakine

À propos de l'auteur

Maître Cécile Zakine — Avocate au Barreau des Alpes-Maritimes, Docteur en Droit. Chaque article de ce magazine est rédigé à partir de l'analyse d'une décision de jurisprudence réelle, commentée et mise en perspective par les équipes de Maître Zakine.

Prendre rendez-vous →

Avertissement: Les analyses présentées sur ce site sont fournies à titre informatif uniquement et ne constituent pas des conseils juridiques personnalisés. Pour une consultation adaptée à votre situation, contactez un avocat.

Articles similaires en Droit-immobilier

Voir tout →

Servitude de passage et tierce opposition : protéger son droit d'accès en copropriété

Un copropriétaire peut-il s'opposer à la suppression d'une servitude de passage qui profite à son lot, même si le syndicat accepte la fin de l'enclave ? La Cour de cassation répond oui, reconnaissant un intérêt distinct pour agir en tierce opposition.

23 juil. 2026Lire →

Enclave et servitude : quand le droit du travail ne crée pas de passage forcé

La Cour de cassation rappelle que l'état d'enclave d'un fonds ne peut résulter des obligations réglementaires imposées aux entreprises en matière d'issues et dégagements. Ainsi, un propriétaire ne peut exiger un passage sur le fonds voisin au seul motif que son bâtiment doit respecter des normes de sécurité incendie.

23 juil. 2026Lire →

Lorsque, faute de convention écrite ou dans le silence, le préavis s'impose

Lorsque, faute de convention écrite ou dans le silence de cette convention, les parties à un contrat de transport public routier de marchandises n'ont pas stipulé une durée de préavis de rupture, cette durée est fixée par un contrat-type approuvé par décret pris en application de l'article L. 1432-4 du code des transports. Les dispositions de l'article L. 442-6, I, 5°, devenu L. 442-1, II, du code de commerce ne trouvent alors pas à s'appliquer. Il en va de même lorsque la convention écrite renvoie expressément à la clause du contrat-type fixant une telle durée. Lorsque les parties ont conclu un contrat écrit stipulant la durée du préavis de rupture, les dispositions de l'article L. 442-1, II, du code de commerce sont applicables. Dans cette hypothèse, l'auteur de la rupture qui a consenti à son partenaire un délai de préavis au moins égal à celui prévu au contrat-type dans sa version en vigueur à la date de la notification de la rupture, ne saurait voir sa responsabilité engagée sur le fondement de ce texte

23 juil. 2026Lire →

Explorez plus d'analyses juridiques en droit droit-immobilier

Tous les articles Droit-immobilier
★★★★★4.9/5 — Avis Google

Maître Zakine, Doctor of Law

Phone and video consultations available — Fast appointments

Book an appointment
First consultation 30 minutes — €45

🔒 Confidentiel • Sans engagement • Réponse rapide