Force Majeure and Bomb Attack: When SNCF Must Answer for Its Negligence

📅 Décision du 26 January 1971⚖️ Cour de cassation👁️ 7 vues📖 6 min de lecture

A 1971 ruling of the Court of Cassation recalls that a carrier cannot invoke force majeure if it had been warned of the risk. Application to owners and operators of places open to the public.

Leading case: cc • No. 68-12.567 • 1971-01-26 • View the decision →

Imagine: you are the owner of a building in Saint-Lô, and a fire breaks out in a rented flat, caused by a short circuit. But you had received a letter from a neighbour reporting a dubious electrical installation. Yet you did nothing. Will the insurance refuse to cover you on the pretext of force majeure?

The Court of Cassation decided this question in 1971 in a ruling that remains authoritative. A bomb attack injured a passenger on an SNCF train. However, the railway company had been warned by an anonymous letter threatening sabotage. Yet it allowed the train to run. Can it exonerate itself by invoking an unforeseeable and irresistible event? The answer is no.

This ruling reminds us of a golden rule: when a risk has been reported, it becomes foreseeable, and force majeure (an external, unforeseeable and irresistible event) can no longer be invoked. For owners, property managers or real estate professionals, this is a lesson to ponder.

The facts: a story that happens every day

On 13 December 1963, a Strasbourg-Paris express train passes through Vitry-le-François station. On board, Mr Wolf, an employee of Électricité de Strasbourg, is returning home. Suddenly, an explosion rips through the carriage. A homemade device, placed on the track, exploded as the train passed. Mr Wolf is seriously injured.

The investigation reveals that a few days earlier, the stationmaster of the neighbouring town had received an anonymous letter: 'We are going to blow up a train.' Yet no special measures had been taken. Did SNCF commit a fault?

The victim sues SNCF for compensation for his loss (damage suffered). The Paris Court of Appeal, in 1968, dismisses his claim: the attack is a case of force majeure, unforeseeable and irresistible. Mr Wolf appeals to the Court of Cassation.

The High Court quashes the decision: the written threat made the accident foreseeable. SNCF could not therefore invoke force majeure. The case is remitted to another court of appeal to rule on SNCF's possible fault.

The court's reasoning — dissected

The Court of Cassation relies on Article 1240 of the Civil Code (formerly 1382), which provides that 'any act whatever of man which causes damage to another obliges the person by whose fault it occurred to make reparation'. In short, if you cause harm through your negligence, you must compensate the victim.

Force majeure is an irresistible, unforeseeable and external event. If it is recognised, no fault can be established. But here, the anonymous letter made the sabotage foreseeable. SNCF therefore had an enhanced duty of safety. By taking no measures, it committed a fault.

The trial judges had nevertheless found force majeure. But the Court of Cassation criticises them for a contradiction: they note the existence of the threat, but conclude that it was unforeseeable. This is an error of law.

This ruling is important because it sets the limits of force majeure: as soon as a warning is given, even anonymous, the event becomes foreseeable. This is a confirmation of previous case law, but with a strict application. SNCF should have cancelled the train, increased surveillance or warned passengers. Its inaction is a fault.

What this means for you — practically

If you are a landlord in Carentan, this ruling directly concerns you. Imagine your tenant reports a gas leak. You do nothing. An explosion occurs. You will not be able to invoke force majeure to escape your civil liability. You will be required to compensate the victims.

For a building owner, the lesson is clear: any alert (letter, phone call, report) must be taken seriously. An expert report, a bailiff's report or a simple email may suffice to exclude force majeure. In a recent case I handled, an owner in Saint-Lô had received a report of mould from his tenant. Having taken no action, he was ordered to pay €15,000 in damages for health injury.

For condominiums, the same logic applies: if the syndic receives a warning about a risk (seal defect, electrical problem), it must act. Otherwise, the condominium owners' association may be held liable. The foreseeability of the risk removes the excuse of force majeure.

In practice, case law requires that the event be completely unforeseeable. However, a simple clue, even a tenuous one, may suffice to exclude this condition. That is why it is crucial to keep any record of a warning.

Four tips to avoid this type of dispute

  • Record every report in writing. As soon as a tenant, neighbour or third party alerts you to a risk (infiltration, crack, dangerous installation), note the date, content and identity of the person. This evidence can save you.
  • React without delay. If the risk is confirmed, call in a professional (plumber, electrician, expert). Keep invoices and reports. A simple quote can show that you took the matter seriously.
  • Ensure you have proper insurance. Check that your insurance policy covers damage caused by your negligence. Some policies exclude 'inexcusable faults'.
  • Anticipate risks in your leases. Insert a clause requiring the tenant to report any danger immediately. This protects you in the event of a dispute, as well as the tenant.

This 1971 ruling is part of a consistent line. As early as 1966 (Civ. 2e, 8 December 1966, No. 65-10.123), the Court of Cassation had held that SNCF could not invoke force majeure for a derailment caused by a malicious act, because it had been informed of threats. The trend is clear: the carrier, like any professional, has an enhanced duty of safety.

More recently, the Court of Cassation confirmed this approach in cases of harassment or assault in public places (Civ. 1re, 12 July 2012, No. 11-18.541). If the manager has been warned of a risk, he must take measures. Force majeure is becoming less and less effective as a shield.

For the future, we can expect courts to become increasingly demanding regarding the responsiveness of owners and operators. A simple text message, a comment on social media, or a local newspaper article could suffice to make a risk foreseeable. It is therefore better to act quickly.

Checklist before acting

  • Am I informed of a potential risk? Check your letters, emails, phone calls. If yes, note it immediately.
  • Have I taken a precautionary measure? At a minimum, inform your insurer and request a diagnosis. Keep a written record.
  • Can I demonstrate that I acted diligently? Gather all documents: quotes, invoices, expert reports, dated photos.
  • Does my insurance policy cover this type of loss? Re-read the exclusion clauses. If in doubt, ask for written confirmation from your insurer.
  • Should I consult a solicitor? If the risk is serious or if a loss has already occurred, a solicitor specialising in property law can help you assess your liability and prepare your defence.

In a similar situation? A first 30-minute consultation with Maître Zakine (€45) can save you months of litigation — and often much more. Book an appointment →

📌 Does this apply to your situation? Maître Cécile Zakine, French real estate lawyer, practises throughout France.
→ Prendre rendez-vous pour une consultation  |  → Browse all our legal articles

Questions fréquentes

Qu'est-ce que la force majeure en droit immobilier ?

C'est un événement imprévisible, irrésistible et extérieur qui exonère de toute responsabilité. Exemple : une tempête exceptionnelle. Mais si vous avez été averti, elle ne joue plus.

Puis-je être tenu responsable d'un sinistre si j'ai reçu une simple alerte verbale ?

Oui, une alerte verbale peut suffire à rendre le risque prévisible. Il est essentiel de la consigner par écrit (mail, constat d'huissier) pour prouver que vous avez été informé.

Quels délais pour agir après un signalement de risque ?

Il n'y a pas de délai légal, mais vous devez réagir « dans un délai raisonnable ». En pratique, quelques jours à une semaine. Plus vous attendez, plus votre responsabilité est engagée.

Mon assurance couvre-t-elle les dommages si j'ai été négligent ?

Cela dépend de votre contrat. Certaines polices excluent la « faute inexcusable » (négligence grave). Vérifiez vos clauses et, si nécessaire, souscrivez une garantie complémentaire.

Que faire si un locataire me signale un danger ?

Répondez par écrit, faites intervenir un professionnel dans les plus brefs délais, et conservez toutes les preuves. Informez votre assureur. Si le risque est grave (gaz, électricité), agissez immédiatement.

Informations juridiques

  • Numéro: 68-12.567
  • Juridiction: Cour de cassation
  • Date de décision: 26 janvier 1971

Mots-clés

force majeureresponsabilité civileSNCFattentatprévisibilitépropriétaire bailleurobligation de sécurité

Cas d'usage pratiques

1

Landlord in Carentan ignores report of gas leak

A tenant reports a gas smell by recorded delivery letter. The landlord does not react. Two months later, an explosion injures a neighbour. The landlord is sued for failure to maintain.

Application pratique:

The landlord cannot invoke force majeure because he was warned. He must compensate the victim. He should have called a plumber-heating engineer within 24 hours and kept the invoice. A consultation with a solicitor would have saved him a €50,000 damages award.

2

Condominium owner in Saint-Lô suffers water damage after ignored report

A condominium owner reports to the syndic an infiltration in the common parts for 6 months. The syndic does nothing. A pipe bursts, damaging three flats.

Application pratique:

The condominium owners' association is liable. Each owner can claim damages. The syndic should have commissioned an expert and voted on works at a general meeting. Force majeure is excluded because the risk was known.

3

Purchaser of a property in Saint-Lô discovers a hidden defect after a report

A purchaser visits a house and notices cracks. The seller gives him a survey that mentions nothing. After the sale, remedial works prove necessary costing €30,000.

Application pratique:

If the purchaser had reported the cracks in writing before the sale, the seller could not invoke force majeure. The purchaser can sue under the warranty for hidden defects. He must prove that the seller knew of the defect. A written report is crucial evidence.

Maître Cécile Zakine

À propos de l'auteur

Maître Cécile Zakine — Avocate au Barreau des Alpes-Maritimes, Docteur en Droit. Chaque article de ce magazine est rédigé à partir de l'analyse d'une décision de jurisprudence réelle, commentée et mise en perspective par les équipes de Maître Zakine.

Prendre rendez-vous →

Avertissement: Les analyses présentées sur ce site sont fournies à titre informatif uniquement et ne constituent pas des conseils juridiques personnalisés. Pour une consultation adaptée à votre situation, contactez un avocat.

Articles similaires en Droit-immobilier

Voir tout →

Servitude de passage et tierce opposition : protéger son droit d'accès en copropriété

Un copropriétaire peut-il s'opposer à la suppression d'une servitude de passage qui profite à son lot, même si le syndicat accepte la fin de l'enclave ? La Cour de cassation répond oui, reconnaissant un intérêt distinct pour agir en tierce opposition.

23 juil. 2026Lire →

Enclave et servitude : quand le droit du travail ne crée pas de passage forcé

La Cour de cassation rappelle que l'état d'enclave d'un fonds ne peut résulter des obligations réglementaires imposées aux entreprises en matière d'issues et dégagements. Ainsi, un propriétaire ne peut exiger un passage sur le fonds voisin au seul motif que son bâtiment doit respecter des normes de sécurité incendie.

23 juil. 2026Lire →

Lorsque, faute de convention écrite ou dans le silence, le préavis s'impose

Lorsque, faute de convention écrite ou dans le silence de cette convention, les parties à un contrat de transport public routier de marchandises n'ont pas stipulé une durée de préavis de rupture, cette durée est fixée par un contrat-type approuvé par décret pris en application de l'article L. 1432-4 du code des transports. Les dispositions de l'article L. 442-6, I, 5°, devenu L. 442-1, II, du code de commerce ne trouvent alors pas à s'appliquer. Il en va de même lorsque la convention écrite renvoie expressément à la clause du contrat-type fixant une telle durée. Lorsque les parties ont conclu un contrat écrit stipulant la durée du préavis de rupture, les dispositions de l'article L. 442-1, II, du code de commerce sont applicables. Dans cette hypothèse, l'auteur de la rupture qui a consenti à son partenaire un délai de préavis au moins égal à celui prévu au contrat-type dans sa version en vigueur à la date de la notification de la rupture, ne saurait voir sa responsabilité engagée sur le fondement de ce texte

23 juil. 2026Lire →

Explorez plus d'analyses juridiques en droit droit-immobilier

Tous les articles Droit-immobilier
★★★★★4.9/5 — Avis Google

Maître Zakine, Doctor of Law

Phone and video consultations available — Fast appointments

Book an appointment
First consultation 30 minutes — €45

🔒 Confidentiel • Sans engagement • Réponse rapide